← Lyft Interview InsightsSoftware Engineer
I knew the general shape of the solution pretty fast, sort by start time, use a min-heap tracking when each worker becomes free, greedily assign to whoever's free earliest.
Model the problem as interval graph coloring: the minimum number of workers equals the maximum number of overlapping jobs. Sort jobs by start time and use a min-heap of end times to assign each job to a worker whose last job has ended, or allocate a new worker if none are free.
Pro tip: Mention that this greedy approach is optimal because it's equivalent to the interval partitioning algorithm, and briefly explain why the number of workers equals the maximum overlap. Also, clarify assumptions about input format and worker availability.
Confirm input format (list of jobs with start/end times), output format (worker assignment per job), and handle edge cases like empty list, zero-duration jobs, and simultaneous start/end times.
Sort the jobs in ascending order of start time. This ensures we process jobs in chronological order, which is crucial for the greedy assignment.
Maintain a min-heap of end times for jobs currently assigned to workers. For each job, if the earliest end time is <= current job's start, that worker is free; pop and reuse. Otherwise, allocate a new worker.
Assign the chosen worker to the job, update the heap with the job's end time, and store the job-to-worker mapping. Ensure worker IDs are consistent.
State time complexity O(n log n) due to sorting and heap operations, space O(n). Explain that the greedy choice is optimal because the number of workers equals the maximum overlap at any point.
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.