← LinkedIn Interview InsightsSoftware Engineer

LinkedIn·Software Engineer·Technical Phone Screen·Intermediate

Intermediate
Jun 2026

Summary

LinkedIn coding screen for a software engineer role, one question the whole time centered on a data structure design problem. Pretty standard vibe but the follow-up about getRandom tripped me up more than I expected.

Questions Asked (1)

Q1

Design a data structure that supports insert, remove, and getRandom, all in average O(1) time. Each element in the set must have an equal probability of being returned by getRandom.

Algorithms & Data StructuresTechnical Trade-offs
Author's notes

I knew the array plus hashmap combo going in, which helped.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Combine a hash map and a dynamic array to achieve O(1) average time for all operations. The hash map stores value-to-index mappings, while the array holds the elements. For removal, swap the element with the last one, update the hash map, and pop from the array. For getRandom, pick a random index from the array.

Pro tip: Mention that this design assumes no duplicates; if duplicates are allowed, clarify how you would handle them (e.g., using a hash map of counts or a set of indices). Also, discuss the trade-off between using a dynamic array (amortized O(1) insert) and a fixed-size array (if the maximum size is known).

1. Clarify requirements and constraints

Ask whether duplicates are allowed, whether the data structure needs to support other operations, and if there are any memory constraints. Confirm that all operations must be average O(1).

2. Propose the hash map + array approach

Explain that a hash map alone doesn't support O(1) random access, and an array alone doesn't support O(1) removal by value. Combining them leverages the strengths of both.

3. Detail the operations

Describe insert: append to array and add to hash map. Remove: swap with last element, update hash map for the swapped element, remove from hash map and pop from array. getRandom: generate random index and return array element.

4. Analyze time and space complexity

State that each operation is O(1) average time (amortized for insert due to dynamic array resizing) and O(n) space. Mention that worst-case for insert could be O(n) due to resizing, but amortized O(1).

5. Discuss edge cases and trade-offs

Cover empty structure, removing non-existent element, and handling duplicates if applicable. Mention alternative approaches (e.g., using a balanced BST for ordered operations) and why they don't meet O(1) requirement.

Key Points to Mention

  • Hash map stores value to index mapping for O(1) lookup.
  • Dynamic array stores elements for O(1) random access.
  • Removal uses swap-with-last technique to maintain contiguous array.
  • Update hash map when swapping to keep indices correct.
  • getRandom uses random index generation with uniform probability.
  • Amortized O(1) for insert due to occasional array resizing.

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.