← Pinduoduo Interview InsightsSoftware Engineer
The brute force is obvious and I almost went with it before catching myself.
Use a monotonic stack to precompute the next greater element (NGE) for every position in the second array in O(n) time, then map each element of the first array to its precomputed NGE. This avoids the naive O(n*m) approach and handles the subset relationship efficiently.
Pro tip: Mention that the subset property allows O(1) lookups after preprocessing, and discuss edge cases like when the first array contains the maximum element. Also, clarify that 'first element strictly greater' means the nearest greater to the right, not any greater element.
Confirm that the first array is a subset of the second, elements are distinct, and we need the nearest greater element to the right for each element in the first array. Ask about input sizes to determine if O(n) is necessary.
Propose using a monotonic decreasing stack to compute the next greater element for each position in the second array. Traverse from right to left, maintaining a stack of candidates for the next greater element.
Iterate through the second array from right to left. For each element, pop elements from the stack that are less than or equal to it, then the top of the stack (if any) is its next greater element. Push the current element onto the stack.
Create a hash map from element value to its next greater element (or -1). Then iterate through the first array and output the mapped values.
State that time complexity is O(n + m) and space complexity is O(n) for the stack and map. Walk through a small example to verify correctness, including edge cases.
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.