← Fuse Energy Interview Insights
This is a follow-up to the base spreadsheet problem so if you haven't already built the dependency graph in the first part, you're starting behind.
Model the spreadsheet as a directed graph where cells are nodes and formula references are edges. To detect cycles, perform a depth-first search (DFS) from the target cell before adding the new dependency, checking if it can reach itself. If a cycle is found, reject the assignment; otherwise, update the graph and recompute values as needed.
Pro tip: Mention that cycle detection should be efficient and not block the UI; consider incremental checks or caching to avoid full graph traversals on every edit. Also, discuss how to handle error propagation and recovery when a cycle is detected.
Confirm the scope: only SUM formulas, direct and indirect cycles, and whether other operations (Set, Get) need modification. Ask about performance expectations and error handling.
Represent each cell as a node and each reference in a formula as a directed edge. For SUM, the cell depends on all cells in the range.
Use DFS or topological sort to check if adding the new edges would create a cycle. If a cycle is detected, raise an error and do not update the cell.
If no cycle, update the graph and recompute the affected cells' values, ensuring consistency and propagating changes efficiently.
Talk about time/space complexity, incremental vs. full recomputation, and potential optimizations like memoization or lazy evaluation.
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.