← Two Sigma Interview InsightsSoftware Engineer

Two Sigma·Software Engineer·Technical Phone Screen·Intermediate

Intermediate
May 2026

Summary

Two Sigma coding round, one algorithmic problem about maximizing capital across a sequence of projects. Clean problem statement, but the solution required combining a sort with a max-heap in a way that isn't immediately obvious if you haven't seen the pattern before.

Questions Asked (1)

Q1

You start with w capital and have n projects, each with a profit value and a minimum capital requirement. You can complete at most k projects, picking any available one whose capital threshold you currently meet and adding its profit to your running total. How do you maximize your final capital?

Algorithms & Data Structures
Author's notes

The greedy intuition clicks fast: always grab the highest-profit project you can currently afford.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Use a greedy strategy with a max-heap to always select the most profitable available project. At each step, add all projects whose capital requirement is met to the heap, then pick the one with the highest profit. Repeat until k projects are completed or no projects are available.

Pro tip: Clarify that the greedy choice is optimal because selecting the highest profit project never reduces future availability, and mention that sorting projects by capital requirement ensures efficient heap updates.

1. Sort projects by capital requirement

Sort the list of projects in ascending order of their minimum capital requirements. This allows efficient addition of projects to the heap as capital increases.

2. Initialize a max-heap and pointers

Use a max-heap to store profits of available projects. Maintain a pointer to track which projects have been considered based on current capital.

3. Iterate up to k times

For each of the k iterations, add all projects with capital requirement <= current capital to the max-heap. If the heap is empty, break.

4. Select the most profitable project

Pop the project with the maximum profit from the heap and add its profit to the current capital. This represents completing that project.

5. Return final capital

After completing at most k projects, return the accumulated capital as the maximum possible.

Key Points to Mention

  • Greedy algorithm: always pick the highest profit among available projects.
  • Use a max-heap (priority queue) to efficiently retrieve the maximum profit.
  • Sort projects by capital requirement to enable efficient addition to the heap.
  • Time complexity: O(n log n + k log n) due to sorting and heap operations.
  • Space complexity: O(n) for storing projects and heap.
  • Edge cases: insufficient capital to start any project, k larger than n, or projects with zero profit.

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.